Denis LedererCanadian Waterproofing Systems · Victoria BC ☎ 250-889-5620

For stratas · Property managers · Depreciation reports

Roof condition reports for strata depreciation reports in BC.

Since July 1, 2024, every BC strata with five or more lots must get a depreciation report on a five-year cycle — no more deferral votes. The report writer can’t sign off on a roof they haven’t assessed, and that’s where I come in: a strata roof inspection before the depreciation report, delivering the verified roof data the report is built on.

Large flat roof on a Vancouver Island building — the kind of roof a strata depreciation report has to price
One roof, one report — the largest single asset most stratas own.

What your report writer needs — and what I deliver

A roofer can’t prepare or sign a depreciation report. Since July 1, 2025, that work belongs to designated professionals — professional engineers, architects, applied science technologists, AACI-designated appraisers, Certified Reserve Planners and professional quantity surveyors. But their report is only as good as the roof information in it, and most of them are not roofers. My roof data package is built to be lifted straight into their document:

  • System identification — membrane or shingle type, layers, installation method, approximate age, confirmed on the roof (and by core sample where the surface won’t tell).
  • Condition and defects — seams, flashings, penetrations, drains and ponding, each defect photographed and tied to a roof plan so anyone can find it again.
  • Remaining-life estimate — an honest number from a Red Seal roofer, with the reasoning shown.
  • Replacement cost range and phasing options — what replacement should cost in today’s Victoria market, and whether repairs or phased work can move the date.
  • AGM-ready format — a document a council member can circulate and defend at the annual general meeting, not a sales quote.

The deadline is real

In the Capital Regional District, stratas with five or more lots that had never obtained a depreciation report had to have one by July 1, 2026 — that deadline has passed, so a Victoria-area strata without a report is already overdue and should be booking a report writer now. In the rest of BC, the catch-up deadline is July 1, 2027. Stratas already in the cycle renew every five years. Councils are booking report writers now, and the roof data has to exist before the writer can finish. If your strata’s roof is a guess in a spreadsheet, that guess is about to become your owners’ monthly contributions.

Beyond the report

The same data package serves strata roof replacement planning (scope and budget before you tender), bid review when the replacement quotes land — comparing roofing bids is project-manager work too — and annual or twice-a-year roof maintenance inspections for townhouse complexes and condo buildings, so the next five-year cycle starts with records instead of surprises. Property managers: one call covers every roof in your portfolio that needs data this cycle.

Independent means independent: I sell the data, not the re-roof. If the roof has years left, the report says so — and your contingency reserve fund keeps money it would otherwise have spent early.

Frequently asked questions

Can a roofer sign a strata depreciation report in BC?

No. Since July 1, 2025, a depreciation report in BC must be prepared by a designated professional — a professional engineer, an architect, an applied science technologist (ASTTBC), an AACI-designated appraiser, a Certified Reserve Planner or a professional quantity surveyor — and roofers are not on that list. A roofer cannot prepare or sign the report, and any roofer who offers to is selling you a problem. What the report writer needs, and what Denis sells, is the roof itself: verified system type, condition, defects with photos, and a remaining-life estimate they can rely on.

What does a depreciation report need about the roof?

Four things: what the roofing system actually is (membrane or shingles, layers, approximate age), its current condition and defects, its estimated remaining service life, and a realistic replacement cost range so the council can set contributions. Denis’s roof data package delivers all four in writing, with photos tied to a roof plan — formatted so a depreciation report writer can lift it straight into the report and a council can circulate it at the AGM.

When does our strata need this done?

BC strata corporations with five or more lots are on a mandatory five-year depreciation report cycle — the old deferral vote is gone. In the Capital Regional District, which includes the Victoria area, stratas that had never obtained a report faced a catch-up deadline of July 1, 2026 — that date has now passed, so those stratas are overdue. In the rest of BC the catch-up deadline is July 1, 2027. The roof inspection and data purchase happens months before the report is written, and the spring AGM season is when councils approve the spending — so the time to book the roof data is before your AGM, not after the deadline letter arrives.

How much should our strata budget for a new roof?

As 2026 general guidance for the Victoria area: flat roof replacement runs about $8–$15 per square foot installed, TPO about $7–$12, and a typical building’s roof is the single largest line in most depreciation reports. Your building’s real number depends on size, access, tear-off and details. A condition report gives your council a defensible range — and, just as valuable, an honest remaining-life estimate, so you are not replacing a roof five years early or funding one five years late.

Why not just get a free inspection from a roofing company?

Because the company’s free inspection is the first step of its replacement bid. Councils have been warned in print that the inspecting roofer may want the replacement job. Denis is paid for the data and does not bid the replacement — if your roof has eight years left, the report says eight years, and your contingency fund keeps its money.

Request roof data for your strata

Tell me the complex, roughly the roof size and type if you know it, and your report or AGM deadline. I’ll quote the inspection in writing.

Prefer to talk? Call 250-889-5620 or email info@waterproofingsystems.ca.

☎ Call Denis — 250-889-5620